{"id":920,"date":"2026-04-28T06:03:41","date_gmt":"2026-04-28T06:03:41","guid":{"rendered":"https:\/\/paulbrowntranslation.com\/?p=920"},"modified":"2026-04-28T06:03:42","modified_gmt":"2026-04-28T06:03:42","slug":"grupo-mexico-and-blackrock-agree-to-merge-their-electricity-generation-assets-in-mexico-for-major-new-private-energy-platform","status":"publish","type":"post","link":"https:\/\/paulbrowntranslation.com\/pt-br\/2026\/04\/grupo-mexico-and-blackrock-agree-to-merge-their-electricity-generation-assets-in-mexico-for-major-new-private-energy-platform\/","title":{"rendered":"Grupo M\u00e9xico and BlackRock agree to merge their electricity generation assets in Mexico for major new private energy platform"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/04\/XSLAIGUQAVFDPEEAZR5NSBI4RU-1024x683.jpeg\" alt=\"\" class=\"wp-image-921\" srcset=\"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/04\/XSLAIGUQAVFDPEEAZR5NSBI4RU-980x654.jpeg 980w, https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/04\/XSLAIGUQAVFDPEEAZR5NSBI4RU-480x320.jpeg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/figure>\n\n\n\n<p><strong>Grupo M\u00e9xico and BlackRock (through its infrastructure arm Global Infrastructure Partners) have agreed to merge their electricity generation assets in Mexico to create a major new private energy platform. <\/strong><br><br>The deal combines Grupo M\u00e9xico\u2019s infrastructure division with Saavi Energ\u00eda, forming a company that will operate <strong>14 power plants<\/strong> located in high-demand regions across the country. Together, these assets will have a <strong>combined capacity of about 4,510 megawatts<\/strong>, with an additional project pipeline of roughly <strong>5,000 megawatts<\/strong>, signaling strong future growth.<\/p>\n\n\n\n<p>Under the agreement, Grupo M\u00e9xico will hold a <strong>70% stake<\/strong>, while BlackRock\u2019s GIP will own the remaining <strong>30%<\/strong>. The transaction is still subject to regulatory approvals and is expected to close in the <strong>third quarter of 2026<\/strong>.<\/p>\n\n\n\n<p>The companies say the merger will create a more <strong>diversified, efficient, and resilient energy platform<\/strong>, helping meet Mexico\u2019s rising electricity demand. It also strengthens Grupo M\u00e9xico\u2019s broader strategy to diversify beyond mining into infrastructure and energy. Additionally, the partnership opens the door to <strong>long-term collaboration on future infrastructure projects<\/strong> in Mexico and potentially abroad.<\/p>\n\n\n\n<p>Overall, the deal positions the new entity as one of the <strong>largest private electricity generators in Mexico<\/strong>, reflecting growing private-sector investment in the country\u2019s energy sector.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Grupo M\u00e9xico and BlackRock (through its infrastructure arm Global Infrastructure Partners) have agreed to merge their electricity generation assets in Mexico to create a major new private energy platform. The deal combines Grupo M\u00e9xico\u2019s infrastructure division with Saavi Energ\u00eda, forming a company that will operate 14 power plants located in high-demand regions across the country. [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":921,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-920","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/posts\/920","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/comments?post=920"}],"version-history":[{"count":1,"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/posts\/920\/revisions"}],"predecessor-version":[{"id":922,"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/posts\/920\/revisions\/922"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/media\/921"}],"wp:attachment":[{"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/media?parent=920"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/categories?post=920"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/pt-br\/wp-json\/wp\/v2\/tags?post=920"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}