{"id":2609,"date":"2026-08-27T09:45:05","date_gmt":"2026-08-27T09:45:05","guid":{"rendered":"https:\/\/paulbrowntranslation.com\/?p=2609"},"modified":"2026-08-27T09:45:08","modified_gmt":"2026-08-27T09:45:08","slug":"iberdrola-us-transmission-ai-grid","status":"publish","type":"post","link":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/","title":{"rendered":"Spain&#8217;s Iberdrola Wires America"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>A new 179km transmission award \u2014 and the pattern behind it: Spanish firms keep winning the grid the AI age runs on<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The Hispano-Luso Report<\/strong><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\">Taken alone, this week&#8217;s news is modest, and this Report says so plainly: <strong>Iberdrola has won the construction of a new 179-kilometre transmission line in the United States<\/strong> \u2014 for a utility group whose American commitments run to the tens of billions, a single line is ordinary metabolism, the kind of award its US business collects in the course of doing what it does. But this masthead has learned to watch what keeps repeating \u2014 and the 179 kilometres land as the latest entry in a pattern the file has been assembling all season: <strong>wherever the English-speaking world is building the electrical backbone of the AI age, a Spanish company keeps signing the work.<\/strong> The award is small. The pattern is the story.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The award, and the empire behind it<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The facts as reported: a 179km line, won for construction in the US market where Iberdrola \u2014 through its American platform \u2014 ranks among the largest grid investors in the country, operating regulated utilities across the Northeast and pouring capital into the wires at a scale few rivals match. Transmission is the least glamorous asset class in energy: steel towers, conductor cable, decade-long permits \u2014 and it is precisely where Iberdrola has built its American fortress, because regulated wires earn steady returns on invested capital for decades, the patient-money economics this Report keeps finding wherever Spanish champions dig in abroad.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The load returns<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Why do new lines matter now more than at any point in a generation? Because <strong>American electricity demand is growing again<\/strong> \u2014 after some two decades of near-flat consumption, the data-centre build-out, electrification and reshored industry have reignited load growth across the US, and the binding constraint is not generation but <strong>transmission<\/strong>: the country&#8217;s interconnection queues are jammed with projects waiting for wires that don&#8217;t yet exist, and every serious analysis of the AI age&#8217;s infrastructure ends at the same bottleneck \u2014 the grid. A new 179km line is, in this context, not routine at all: it is a unit of the scarcest commodity in American energy, and the companies that can permit, build and operate transmission are holding the shovels of the decade.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The electron layer<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Now the pattern, assembled from this season&#8217;s file. In <strong>London<\/strong>, ACS&#8217;s Hochtief is delivering National Grid&#8217;s billion-pound upgrade \u2014 sixty kilometres of cabling whose explicit purpose includes unlocking connections for five data centres drawing a gigawatt. In <strong>Australia<\/strong>, the same group&#8217;s UGL lays the first AI-grade fibre between Sydney and Melbourne. In <strong>America<\/strong>, ACS&#8217;s Turner builds the hyperscaler sheds themselves \u2014 and now Iberdrola strings more of the wires that feed them, while in <strong>Spain<\/strong>, the gigafactory consortium bids to host Europe&#8217;s sovereign compute. Stack the entries and the claim writes itself: <strong>Spanish firms are positioned beneath every layer of the AI build-out<\/strong> \u2014 the sheds, the power, the fibre, the compute \u2014 across three continents, in two distinct corporate species: the contractors (ACS and kin) who build for clients, and the <strong>operator-investors<\/strong> (Iberdrola) who own the assets and collect the regulated returns for decades after the contractors go home. The second species is the quieter and, over time, likely the richer position.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why the wires keep going Spanish<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The structural answer deserves its paragraph. Spain ran one of the world&#8217;s fastest renewables build-outs, which forced one of its fastest grid expansions \u2014 and the companies schooled in that decade (utilities and contractors alike) converted the home curriculum into an export franchise, exactly as the high-speed-rail builders did before them. Add the regulated-utility model&#8217;s fit with Spanish corporate patience \u2014 decade-horizon capital, inflation-linked returns, political-risk management as a core skill \u2014 and the anglosphere&#8217;s grid programmes keep finding the same names at the table. It is the masthead&#8217;s oldest thesis in its newest costume: hard-won domestic schooling, sold to the English-speaking world at scale.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The honest ledger<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The counterweights, at full weight \u2014 and this piece owes an extra one. <strong>The award&#8217;s own details remain thin as reported<\/strong> \u2014 route, client and value per the trade coverage, graded accordingly, and this Report upgrades the entry as the specifics publish. <strong>One line is one line<\/strong>: the pattern-claim rests on the season&#8217;s accumulated entries, not on this award&#8217;s size, and the machine&#8217;s own first ranking filed it as routine \u2014 the piece exists because the file&#8217;s pattern crossed a threshold, and the reader deserves that candour. <strong>US transmission is permitting purgatory<\/strong> \u2014 American lines routinely take a decade from proposal to energisation, and construction awards sit at the <em>end<\/em> of that gauntlet, which cuts both ways: the hard part is done, and the hard part is why supply stays scarce. And <strong>the fifth check hums gently<\/strong> \u2014 grid operators announce awards because growth narratives support rate cases and share prices alike.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The scoreboard<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Mark the entry, sized honestly: a modest award, filed atop a pattern that is no longer modest at all. The watch-list takes the thesis rather than the line: <strong>each new electron-layer entry<\/strong> (the file&#8217;s threshold for the full theme edition \u2014 \u00abSpain wires the AI age\u00bb \u2014 is close), Iberdrola&#8217;s next American grid commitments, and the load-growth numbers that keep the whole layer scarce. The AI age will be remembered for its models; it will have been <em>built<\/em> of concrete, copper and conductor cable \u2014 and the hands on the conductor keep speaking Spanish. Watch the wires.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"wp-block-paragraph\"><em>The Hispano-Luso Report tracks the Spanish- and Portuguese-speaking business news that English-speaking coverage overlooks \u2014 analysed beyond the English-language headlines. Sources: elEconomista, company statements, US grid and load-growth data.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A new 179km transmission award \u2014 and the pattern behind it: Spanish firms keep winning the grid the AI age runs on The Hispano-Luso Report Taken alone, this week&#8217;s news is modest, and this Report says so plainly: Iberdrola has won the construction of a new 179-kilometre transmission line in the United States \u2014 for [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":2612,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[30],"tags":[],"class_list":["post-2609","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-hispano-luso-report"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Iberdrola US Transmission Win: Wiring the AI Age&#039;s Grid<\/title>\n<meta name=\"description\" content=\"Iberdrola wins a 179km US transmission line \u2014 the latest in a pattern: Spanish firms keep building the grid the AI age runs on. The electron layer, mapped.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Iberdrola US Transmission Win: Wiring the AI Age&#039;s Grid\" \/>\n<meta property=\"og:description\" content=\"Iberdrola wins a 179km US transmission line \u2014 the latest in a pattern: Spanish firms keep building the grid the AI age runs on. The electron layer, mapped.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/\" \/>\n<meta property=\"og:site_name\" content=\"Paul Brown Translation\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-27T09:45:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-27T09:45:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/08\/iberdrola-us-transmission-ai-grid.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Paul Brown\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Paul Brown\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/\"},\"author\":{\"name\":\"Paul Brown\",\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/#\\\/schema\\\/person\\\/251e197cb4d9df8675fee63cabfe102e\"},\"headline\":\"Spain&#8217;s Iberdrola Wires America\",\"datePublished\":\"2026-08-27T09:45:05+00:00\",\"dateModified\":\"2026-08-27T09:45:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/\"},\"wordCount\":943,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/#\\\/schema\\\/person\\\/251e197cb4d9df8675fee63cabfe102e\"},\"image\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/paulbrowntranslation.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/iberdrola-us-transmission-ai-grid.png\",\"articleSection\":[\"Hispano-Luso Report\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/\",\"url\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/\",\"name\":\"Iberdrola US Transmission Win: Wiring the AI Age's Grid\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/paulbrowntranslation.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/iberdrola-us-transmission-ai-grid.png\",\"datePublished\":\"2026-08-27T09:45:05+00:00\",\"dateModified\":\"2026-08-27T09:45:08+00:00\",\"description\":\"Iberdrola wins a 179km US transmission line \u2014 the latest in a pattern: Spanish firms keep building the grid the AI age runs on. The electron layer, mapped.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/#primaryimage\",\"url\":\"https:\\\/\\\/paulbrowntranslation.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/iberdrola-us-transmission-ai-grid.png\",\"contentUrl\":\"https:\\\/\\\/paulbrowntranslation.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/iberdrola-us-transmission-ai-grid.png\",\"width\":1536,\"height\":1024,\"caption\":\"iberdrola-us-transmission-ai-grid\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/2026\\\/hispano-luso-report\\\/iberdrola-us-transmission-ai-grid\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Spain&#8217;s Iberdrola Wires America\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/#website\",\"url\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/\",\"name\":\"Paul Brown Translation\",\"description\":\"Spanish &amp; Portuguese to English Translator \",\"publisher\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/#\\\/schema\\\/person\\\/251e197cb4d9df8675fee63cabfe102e\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":[\"Person\",\"Organization\"],\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/#\\\/schema\\\/person\\\/251e197cb4d9df8675fee63cabfe102e\",\"name\":\"Paul Brown\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/cropped-Paul-Brown-Translation-favicon.png\",\"url\":\"https:\\\/\\\/paulbrowntranslation.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/cropped-Paul-Brown-Translation-favicon.png\",\"contentUrl\":\"https:\\\/\\\/paulbrowntranslation.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/cropped-Paul-Brown-Translation-favicon.png\",\"width\":512,\"height\":512,\"caption\":\"Paul Brown\"},\"logo\":{\"@id\":\"https:\\\/\\\/paulbrowntranslation.com\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/cropped-Paul-Brown-Translation-favicon.png\"},\"sameAs\":[\"https:\\\/\\\/paulbrowntranslation.com\\\/\"],\"url\":\"https:\\\/\\\/paulbrowntranslation.com\\\/es\\\/author\\\/pbrown\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Iberdrola US Transmission Win: Wiring the AI Age's Grid","description":"Iberdrola wins a 179km US transmission line \u2014 the latest in a pattern: Spanish firms keep building the grid the AI age runs on. The electron layer, mapped.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/","og_locale":"es_ES","og_type":"article","og_title":"Iberdrola US Transmission Win: Wiring the AI Age's Grid","og_description":"Iberdrola wins a 179km US transmission line \u2014 the latest in a pattern: Spanish firms keep building the grid the AI age runs on. The electron layer, mapped.","og_url":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/","og_site_name":"Paul Brown Translation","article_published_time":"2026-08-27T09:45:05+00:00","article_modified_time":"2026-08-27T09:45:08+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/08\/iberdrola-us-transmission-ai-grid.png","type":"image\/png"}],"author":"Paul Brown","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Paul Brown","Tiempo de lectura":"5 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/#article","isPartOf":{"@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/"},"author":{"name":"Paul Brown","@id":"https:\/\/paulbrowntranslation.com\/es\/#\/schema\/person\/251e197cb4d9df8675fee63cabfe102e"},"headline":"Spain&#8217;s Iberdrola Wires America","datePublished":"2026-08-27T09:45:05+00:00","dateModified":"2026-08-27T09:45:08+00:00","mainEntityOfPage":{"@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/"},"wordCount":943,"commentCount":0,"publisher":{"@id":"https:\/\/paulbrowntranslation.com\/es\/#\/schema\/person\/251e197cb4d9df8675fee63cabfe102e"},"image":{"@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/#primaryimage"},"thumbnailUrl":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/08\/iberdrola-us-transmission-ai-grid.png","articleSection":["Hispano-Luso Report"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/","url":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/","name":"Iberdrola US Transmission Win: Wiring the AI Age's Grid","isPartOf":{"@id":"https:\/\/paulbrowntranslation.com\/es\/#website"},"primaryImageOfPage":{"@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/#primaryimage"},"image":{"@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/#primaryimage"},"thumbnailUrl":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/08\/iberdrola-us-transmission-ai-grid.png","datePublished":"2026-08-27T09:45:05+00:00","dateModified":"2026-08-27T09:45:08+00:00","description":"Iberdrola wins a 179km US transmission line \u2014 the latest in a pattern: Spanish firms keep building the grid the AI age runs on. The electron layer, mapped.","breadcrumb":{"@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/#primaryimage","url":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/08\/iberdrola-us-transmission-ai-grid.png","contentUrl":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/08\/iberdrola-us-transmission-ai-grid.png","width":1536,"height":1024,"caption":"iberdrola-us-transmission-ai-grid"},{"@type":"BreadcrumbList","@id":"https:\/\/paulbrowntranslation.com\/es\/2026\/hispano-luso-report\/iberdrola-us-transmission-ai-grid\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/paulbrowntranslation.com\/es\/"},{"@type":"ListItem","position":2,"name":"Spain&#8217;s Iberdrola Wires America"}]},{"@type":"WebSite","@id":"https:\/\/paulbrowntranslation.com\/es\/#website","url":"https:\/\/paulbrowntranslation.com\/es\/","name":"Paul Brown Translation","description":"Spanish &amp; Portuguese to English Translator ","publisher":{"@id":"https:\/\/paulbrowntranslation.com\/es\/#\/schema\/person\/251e197cb4d9df8675fee63cabfe102e"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/paulbrowntranslation.com\/es\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":["Person","Organization"],"@id":"https:\/\/paulbrowntranslation.com\/es\/#\/schema\/person\/251e197cb4d9df8675fee63cabfe102e","name":"Paul Brown","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/03\/cropped-Paul-Brown-Translation-favicon.png","url":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/03\/cropped-Paul-Brown-Translation-favicon.png","contentUrl":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/03\/cropped-Paul-Brown-Translation-favicon.png","width":512,"height":512,"caption":"Paul Brown"},"logo":{"@id":"https:\/\/paulbrowntranslation.com\/wp-content\/uploads\/2026\/03\/cropped-Paul-Brown-Translation-favicon.png"},"sameAs":["https:\/\/paulbrowntranslation.com\/"],"url":"https:\/\/paulbrowntranslation.com\/es\/author\/pbrown\/"}]}},"_links":{"self":[{"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/posts\/2609","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/comments?post=2609"}],"version-history":[{"count":3,"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/posts\/2609\/revisions"}],"predecessor-version":[{"id":2613,"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/posts\/2609\/revisions\/2613"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/media\/2612"}],"wp:attachment":[{"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/media?parent=2609"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/categories?post=2609"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/paulbrowntranslation.com\/es\/wp-json\/wp\/v2\/tags?post=2609"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}